top of page

Utilities and Infrastructure Facilities

 

Large electrical transformer: 1,000 KVA ensures stable and sufficient power for both heavy machine and air conditioning throughout the offices.

 

Fire protection system: Fire hoses and fire hydrants around the building, along with fire extinguishers in easily accessible locations.

 

Water reserve system: Large, tall water tanks ensure consistent water pressure and sufficient water supply.

 

Robust structure: The building is designed with a special reinforced steel structure, ready for the installation of overhead cranes to increase the capacity for lifting and moving heavy goods.

​

The loading area is designed to be extra wide and strong to accommodate the easy access of large trucks and trailers.

โกดังให้เช่า เทพารักษ์ | CNG Warehouse
Chris & Ganesh Warehouse
Christ & Son Building

Chris & Ganesh Warehouse co.,ltd.
Christ & Son Building
     116 Moo2, Theparak rd km26, Bang Sao Thong, Samut Prakan 10570, Thailand
cngwarehouse@gmail.com
+66 65 645 7624
+66 89 664 9201

 

bottom of page